亚洲一二三四五区,狠狠干强奸网,婷婷在线激情五月天,精品人妻啊啊啊

Welcome to the official website of Zhucheng Zhaoyang Machinery Co., LTD.

Web site announcement
This website is the official website of Zhucheng Chaoyang Machinery Co., LTD. Please pay attention to slaughtering products and industry information
  TEL:(Manager Zhu)15650277057

Contact us


Chaoyang machinery Co. LTD

phone:(Manager Zhu)15650277057

tel:0536-6480866

fax:0536-6480866

email:zczhaoyang@126.com

url:m.97piao.cn

Address: Shunwang Street Development Zone, Zhucheng city, Shandong Province

Company News

Company News

Your Current Location : Home News Company News

Broiler slaughter and processing process

Source: Time:2015-08-22 16:44:03 views:

Before unloading, obtain the certificate of conformity issued by the animal epidemic prevention supervision organization at the place of origin, and observe the vehicle.

One、 Schematic diagram of broiler slaughtering and processing process
Hair chicken hanging → water bath anesthesia → assassination → bleeding → scalding → depilation → manual cleaning of small hairs → chicken hair water rushing into chicken hair collection room → claw cutting → hanging → opening → viscera removal → cutting head → carcass cleaning → precooling → carcass draining → viscera entering visceral processing room for treatment → carcass hanging → segmentation → sorting → sorting, weighing and packaging → loading → quick freezing → packing → refrigeration → sales
Two、 Slaughtering and processing technology of broiler
1. Chicken feed
(1) Before unloading, obtain the certificate of conformity issued by the animal epidemic prevention supervision organization at the place of origin, and observe the vehicle. If no abnormality is found, the vehicle is allowed to unload after the certificate and goods are consistent.
(2) The chicken cages with feather chickens are removed from the transport vehicle and placed on the hanging platform. The quarantine personnel conduct on-site inspection. The chicken cages with qualified healthy feather chickens are placed on the chicken cage conveyor and transported to the hanging room on the feather chickens.
(3) The hair chicken hanging room and the slaughtering workshop shall be strictly separated. The hair chicken hanging room shall be designed as dark as possible to avoid strong light exposure, resulting in excessive tension when the hair chicken flapping its wings.
(4) The chicken hanging personnel took out the feather chicken from the chicken cage holding the chicken belly, and then hung the two chicken feet on the hanger of the production line. Each chicken hanging staff can hang 800-1000 chickens per hour.
(5) The returned chicken cages are automatically transported into the chicken cage cleaning machine by the conveyor for cleaning, and the cleaned chicken cages slide to the chicken unloading platform through the chicken cage ramp.
2. Slaughtering and depilation of Broilers
(1) The main processes completed by the broiler slaughtering elevated transmission line are: hanging the chicken, water bath type hemp electricity, assassination, bleeding, scalding, depilation, claw cutting, hanging, etc.
(2) The overhead transmission line rack spacing: 6 inches (152.4mm), using standard drive chain, chain pitch t=25.4mm, variable frequency speed regulation, the design killing capacity of the production line is closely related to the linear speed of the production line, and the calculation formula of linear speed: linear speed = hourly output (only / hour) × Pylon spacing (m) ÷ 60 (min / h)
For example: design capacity: 3000 PCS / h, pylon spacing: 152.4mm
Line speed of production line: 3000 PCS / h × 0.1524 m ÷ 60 min / h =7.62 M / min.
(3) Water bath type anesthesia is usually used for live chickens. The anesthesia voltage is 70-90v and the anesthesia time is 2-3s. Or not through the hemp electricity process, the chicken is automatically transported for 1min through the overhead transmission line after hanging, so that the chicken can be stabbed after calming down.
(4) The bleeding time of the feather chicken after assassination is generally designed to be 3-4min. Scalding time: 40-60s, depilation time: 15-30s.
(5) Constant temperature ironing machine is used for ironing, and the ironing temperature is 58-62 ℃. Hang type depilation shall be adopted as far as possible to avoid infection caused by carcass contact.
(6) At 90. An automatic claw cutting machine is designed at the turning of the. The claw cutting machine is composed of a locating wheel, a drive and a rotating blade. After the chicken claw is cut, the chicken claw is unloaded by the claw unloader and placed in the collection vehicle.
3. To cut open the viscera
(1) The main processes completed by the broiler gut opening and evisceration elevated conveyor line include: gut opening, evisceration, head cutting, carcass cleaning, etc.
(2) The hook spacing of the overhead conveyor line: 8 inches (203.2mm), using standard drive chain, chain pitch t=25.4mm, variable frequency speed regulation.
(3) Put the extracted viscera into the visceral chute for inspection by the quarantine personnel. The qualified chicken carcass will enter the next process, the qualified chicken viscera will enter the visceral processing room for treatment, and the unqualified carcass and viscera will be put into a closed car and pulled out of the slaughtering workshop for treatment.
(4) The internal organs are separated. The chicken intestines are cleaned and sorted out and then put into the cold storage for cold storage. The chicken gizzards use the chicken gizzard degreasing machine to remove the grease on the surface of the chicken gizzards, and then the gizzard skin is peeled off by the gizzard peeling machine. After cleaning and sorting, the chicken intestines are put into the cold storage for cold storage.
(5) Eviscerate, the carcass must be cleaned before precooling to remove blood and water from the body.
4. Precooling
(1) Precooling is divided into pool precooling and spiral precooling. The area occupied by pool precooling is larger than that of precooling by precooling machine.
(2) Precooling water temperature: 0-2 ℃, precooling time: 45min.
(3) The pre cooled carcass shall be drained by a dryer or an overhead conveyor line.
(4) The central temperature of pre cooled chicken carcass was below 10 ℃.
5. Split packaging
(1) The distance between hooks for dividing the overhead conveyor line: 8 inches (203.2mm), using standard drive chain, chain pitch t=25.4mm, variable frequency speed regulation.
(2) On the elevated conveying line, there are segmentation operators to segment the meat at different parts, and the segmented meat is transferred to the sorting station on the flat conveyor for sorting.
(3) Weigh the sorted meat and vacuum pack it according to the requirements, put it into the freezing tray, and use the cold meat trolley to push it to the freezing warehouse (-30 ℃) for freezing or to the finished product cooling room (0-4 ℃) for fresh preservation.
(4) Pack the frozen product pallets and store them in the refrigerator (-18 ℃).
(5) Temperature control of split packaging room: 10-15 ℃.

keys: 
Home   |  About us   |  News   |  Products   |  Case   |  Video   |  Contact Us   | 

Copyright © all rights reserved◎Zhaoyang Machinery Co., Ltd. 
Tel:0536-6480866     Fax:0536-6480866      Contact person: (Manager Zhu) 15650277057

Address: King Street Development Zone, Zhucheng City in Shandong Province       Technical support: Hengtai interconnection

Website record number: Shandong ICP preparation of 14004351 -8 

囩产青春草免费视频| 亚洲国产AV无码精品无广告| 99国内精品久久久久影院| 97视频 久久久| 久久夜色精品噜噜网站| 日本二区精品| 先锋影音aV在线资源资源站| 人人射人人操| 曰日色欧美| 久久国产精品免费观看8| 国产老湿机国产在线观看| 人妻一区二区欧美三区| 欧美A级久久久| 成人高潮喷水视频免费看| 丁香五月深爱激情| X8X8三及片| 亚洲aaa| 久桃免费视频| 欧美一区 日韩精品| 毛片中文网| 欧美国产综合亚洲91| 国产无码在线传媒| 性色αv国产精品久久久| 国产亚洲综合精品电影| v天堂在线播放| 韩日欧美黄色免费看| 国产又大又粗又黄| 人妻极品丝袜高跟鞋| 国产第一页久久亚洲| 高清无码少妇| 久久视屏婷婷| 阜康市| 国产白浆自拍激烈视频| 久久久久国色ΑV免费观看| 另类一aⅤ| 国产成人亚洲综合另类麻豆| 四虎WWW影院| 午夜福利肏屄| 五月婷婷二月丁香| 国产精品亚洲一区二区z| 日日日夜一区二区久久|